Requirements

Preparation and planning of a WLAN site survey
For the preparation and planning of a radio survey blue networks needs schedules, building plans, floor plans and layout plans of the location to be illuminated in time, that means at least 3 work days before the fixed appointment. The plans should be provided in electronically form.

Employees
At the radio survey location an employee should be available during the site survey due date, who is responsible for the security of the operations and who can be asked for help during the site survey (e.g. a company technician would be advantageous)

Free Access
During the WLAN Site Survey the survey team should have free access to all locations which should be surveyed.

Measuring in ceiling height
If the site survey takes place in rooms with a ceiling height of more than 3.5 m, lifting vehicles, ladders or other equipment should be provided at the location, to be able to work in ceiling height. Maybe a driver for this appliance might be necessary.

Contact Person
To coordinate the aim and the result, before and after the site survey a person who is responsible for the site survey result, should be available at the location.

Visit also our Online-Seminar about "WLAN Positioning"!

Contact us

There is no form with this name or may be the form is unpublished, Please check the form and the url and the form management.

Your contact person

blue networks GmbH & Co. KG
Die Weidenbach 6

63674 Altenstadt

Tel.: +49 6047 987710
Fax: +49 6047 987719

E-Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

Our partner in the ISP environment

HessenKom GmbH & Co. KG
Die Weidenbach 6

63674 Altenstadt

Tel.: +49 6047 987710
Fax: +49 6047 987719

E-Mail: This email address is being protected from spambots. You need JavaScript enabled to view it.

blue networks GmbH & Co. KG (c) 2019 | Die Weidenbach 6 | 63674 Altenstadt | All rights reserved